Water Supply / Water Treatment

EPC-MOD

EPC delivery of the MOD water-treatment plant and 18 km transmission pipeline supporting 300–600 KBWPD at the Al Zubair oil field.

EPC-MOD

About the project

The project supports the Al Zubair Oil Field with an initial production capacity of 300 KBWPD, expanding to 600 KBWPD. Executed under an EPC contract, it includes the MOD water-treatment plant (with preliminary and advanced treatment trains), an 18 km transmission pipeline to the valve station, a 600 mm HDPE pipeline (1 km) to the North Degassing Station, and a 500 mm HDPE pipeline (7 km) to HAMMAR IPF.

Key components

  • MOD water-treatment plant (preliminary + advanced trains)
  • 18 km transmission pipeline to valve station
  • 600 mm HDPE pipeline (1 km) to NDGS
  • 500 mm HDPE pipeline (7 km) to HAMMAR IPF

Al Amar scope

  • Sub-vendor pre-qualification and bid evaluation
  • Technical and commercial analysis
  • Procurement management and logistics coordination
  • Inspection and quality oversight
  • Cost control and contract administration
  • Progress tracking and stakeholder coordination